GAF Commercial Roofing Products CAD Details Search using keywords: gas hydrocarbon piping welding
503A Termination at R.T.U. with Welded Lap
524 Split Pipe Boot (TPO Only)
502 Pipe Flashing
506A SA Vapor Retarder at Pipe Penetration
506B SA Vapor Retarder with Field Wrap at Pipe Penetration
100E RhinoBond (RB) Assembly
101E Mech Attached Roof Assembly with Intermediate Induction Welded Fastener Row
107A RhinoBond (RB) DrillTec Fastening ZonesOver Approved Steel or Concrete Decks
107B RhinoBond (RB) DrillTec Fastening ZonesOver Approved Wood Decks
108A RhinoBond (RB) Purlin Fastening ZonesRhinoBond Attachment
110F Metal Retrofit (MR) Ridge Flashing DrillTec RhinoBond (RB) Purlin Attachment
111A RhinoBond (RB) Standard Fastening Pattern Over Approved Steel or Concrete Decks
111B RhinoBond (RB) Standard Fastening Pattern Over Wood Decks
111C RhinoBond (RB) Standard Fastening Pattern Over Approved Steel Decks
120 RhinoBond (RB) Staggered Insulation Board Layout
121 RhinoBond (RB) 90 PSF Fastening Pattern Over approved Steel or Concrete Decks
122 RhinoBond (RB) 120 PSF Fastening Pattern Over approved Steel or Concrete Decks
513 MB BUR Piping Through Roof Deck